Tag: EA
-

SND@LHC and its upgrade studies (AdvSND)
SND@LHC and its upgrade studies (AdvSND) 6 DECEMBER, 2023 | By Lukasz Krzempek and Deepti Kandhol The Scattering and Neutrino Detector at the LHC (SND@LHC) aims to make measurements with neutrinos of all three flavours at the LHC and to search for feebly interacting particles in a hitherto unexplored domain. The detector is a combination
-

An East & North Areas teaser
An East & North Areas teaser 5 DECEMBER, 2023 | By Markus Brugger Our accelerator complex is a succession of machines that accelerate particles to increasingly higher energies, each stage boosting the energy of a beam of particles before injecting it into the next machine in the sequence. For protons it starts with the Linac4.
-
ECRs and EDMS documents managed by the BE-EA group kept up-to-date by Silvia Schuh and Giulia Romagnoli.
ECRs and EDMS documents managed by the BE-EA group kept up-to-date by Silvia Schuh and Giulia Romagnoli. All document in BLUE are already ported in the NEW JIRA PROJECT ECRs/important EDMS documents that are currently under approval: ECRs/important EDMS documents that have been approved: Document for Experts.
-

Engineering & Configuration Management (EC)
Engineering & Configuration Management (EC) Activities: Engineering support, Vacuum, gas and Cabling activities thermal and mechanical validations, configuration management. The Engineering and Configuration (EC) section provides Configuration Management, Engineering, Cabling and Connectors, Gas and Vacuum expertise and Operation Support for CERN’s secondary beams & Experimental Areas. In particular, the section is responsible for: o North-Area
-

Design & Coordination (DC)
Design & Coordination (DC) Activities: Design and integration studies, Secondary Beams and Experimental Areas super-intendents, technical coordination and planning, beam line equipment maintenance, mechanical support, scaffolding, etc. The Design & Coordination (DC) section provides design, integration, coordination and mechanical support for CERN’s secondary beams & Experimental Areas (LHC experimental areas, EAST HALL, NORTH AREA, AD
-

Projects and Resources (PR)
Projects and Resources (PR) Activities: Project studies, management and coordination, financial follow-up, quality assurance, etc. The PR section brings together key projects within the EA group ensuring their successful preparation and later completion. The corresponding project leaders (PLs) or technical coordinators ensure together with their teams the overall project management. This follows a well-defined WBS,
-

Liaison to Experiments (LE)
Liaison to Experiments (LE) Activities: Beamline design & commissioning, user and operation support, test facilities, project support, associated committees, etc. The LE section is responsible for the design of the secondary beams downstream the primary targets and of the corresponding experimental areas, as well as of irradiation or test facilities in the CERN accelerator complex
