CERN
| Accelerating science
Sign In
Directory
News
Latest News
BE-EA Youtube Channel
EA outside BE
Advent Calendar
2020
A few experiments
AD/ELENA ready for post LS2
AWAKE and HiRadMat 2020
Beamline and physics studies
Cabling, Connectors and Qualification
Cleaning and dismantling
Collimators and the RL40 workshop
East Area: Re-Construction started
FASER
HL-LHC: WP8/WP12 LS3 in full swing
Hostlab and related projects
Integration and Design
Mechanical support and vacuum
North Area – Ready for Consolidation
Outreach Stories
Physics Beyond Colliders
Planing, coordination and configuration
Safety first
Scaffolding
Shielding activities
Software Migration Project
Special moments in 2020
Total gas management
XCETs and CEDARs
2021
2021 Echafaudage et mecanique
Antiproton Décélérateur
CEDAR Upgrade: from 1975 to EYETS 2022
Cabling Team Challenges – ATLAS New Small Wheel in b. 191
Circuit Coordination – Why care?
Completion of the East Area renovation
FUTURE AMENAGEMENT Zone extérieure BBQ/PIZZA
Gas Renovation
HiRadMat Overview 2021
News from the Design office
Our East Area Shining with IRRAD/CHARM
PBC Studies/Experiments becoming reality during the 2021 operation
Preparing ATLAS for High Luminosity LHC
Realization of Airtightness for the Primary areas
Robotic Inspections
Software Migration
Sur le chemin d’un nouveau système de lecture de position pour les collimateurs – NA-CONS
The CO2 Cooling Project for ATLAS & CMS
Three stories
Two stories
Vacuum in the NA Experimental Areas & Beamlines
What’s new for XCET 2021
2022
Beam operation and challenges
CELESTA – A Space Dream Coming True
Challenges of Scanning and XTAX Tables
Configuration Management and operational aspects
Consolidating the Micro-collimator
HiRadMat 2022
Magnetic Collimators
New Design XCET Detector
New Tools for Users Management in Experimental Area (ASM-EA
News from the CERN Cabling team
North Experimental Area Cable Cleaning Campaign
Objectives towards LS3 for the Cabling team
RF separated beams
SND@LHC
TAXS MOCKUP – HL LHC WP8
Technical Galleries Consolidation
The CEDAR-H upgrade
The CERN Cabling team
The NA-CONS integration
The P42 enigma
The antimatter transport challenge
The longest running experiment at the SPS
The new VXSS chamber
Total Gas Management Highlights 2022
VXSS Vacuum Chamber Replacement and Preparatory Works
Vacuum in NA Experimental Areas & Beamlines
2023
10th Anniversary for Beamline For Schools (BL4S)
ALICE3 Preview
AMS – A Fixed Target Experiment which you will not find in the Layout Database
An East & North Areas teaser
CERN Cabling team
ECN3: Pushing Beam Intensities and ensuring a bright physics future
Future AMBER Plans at BE-EA
How a facility sets us ‘on fire’
Kaon beams and experiments at CERN
Le vide au service des expériences NA et EA
Looking deeper into the muons with MUonE
Preparing the Platform for Neutrino Detectors
Quality Assurance Process of a New Connector for ATLAS ITk Strips
SND@LHC AND ITS UPGRADE STUDIES (AdvSND)
T08 beamline for IRRAD and CHARM
T11 Beamline for CLOUD
The BDF/SHiP Proposal
The CERN Small Giant: the Antimatter Factory
The NA62 Experiment
The SHADOWS muon flux measurement
The Water Cherenkov Test Experiment
We trap antimatter at AD, now what?
What experiment to run in ECN3 after LS3?
What is PPS2 about, and how are we involved?
Why do we study a Muon Collider if we have the FCC?
Why the ESPP and P5 strategy process are important to us
2024
Internal News
Announcements
About EA
Mandate
Sections
Design & Coordination (DC)
Engineering & Configuration Management (EC)
Liaison to Experiments (LE)
Projects and Resources (PR)
Organigram
Duty Travel
Admin & Procedure
Experts & Representatives (CERN only)
ECRs and other EDMS documents managed by the BE-EA
Templates
Experimental Areas
East Area
T08 : IRRAD & CHARM
T09
T10
T11 CLOUD
East Area Contacts (CERN Network)
North Area
EHN1
EHN2
H2
H4
H6
H8
K12
M2
North Area Contacts (CERN Network)
HiRadMat
Beamline Responsibles
Test beam user guide
MD Planning in North Area
YETS 25-26 Access Planning
Services & Support
Cabling Team
Configuration Management
Gas
Mechanical Workshop
Scaffolding Team
Vacuum Team
Projects
AD-CONS
HI-ECN3
HL-LHC WP8
NA-CONS
Physics Beyond Colliders
Search