ECRs/important EDMS documents that are currently under approval:
| Document Title | Author | EDMS ref | Status | Last EDMS Update | EATM | IEFC | comment | |||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document # | documents are presented for approval earliest at the second version or when there are no further blocking comments on it. | |||||||||||||||||||||||||||||||||
| AD – ELENA | ||||||||||||||||||||||||||||||||||
| Protection against Accidental Contacts for Normal Conducting Magnets of AD Complex | Olivier Crettiez | 2338982 – AD-M-EC-0001 v.0.2 | Under approval #1 | 2020/04/06 | approved (date?) | not needed | mail sent to author 7/01/2022 | |||||||||||||||||||||||||||
| AD Consolidation Work Packages | Francois BUTIN | 2364085 – AD-PM-MR-0001 v.0.1 | eng check #1 | 2021/11/15 | presented for information 2020/12/14 | to be presented for approval | ||||||||||||||||||||||||||||
| AD Consolidation Project Management Plan | Francois Butin |
|
|
| 2588555 v.0.4 | | | AD-PM-MG-0004 v.0.4 | eng check #1 | 2022/01/13 | to be presented for info | for info | ||||||||||||||||||||||
AD Consolidation Project Management Plan | ||||||||||||||||||||||||||||||||||
|
| 2588555 v.0.4 | | | AD-PM-MG-0004 v.0.4 | ||||||||||||||||||||||||||||||
| 2588555 v.0.4 | | | AD-PM-MG-0004 v.0.4 | |||||||||||||||||||||||||||||||
2588555 v.0.4 | | | AD-PM-MG-0004 v.0.4 | ||||||||||||||||||||||||||||||||
| High Voltage Power Converters for PUMA experimental area: Correctors, Quads and Bending Elements | Christophe Machado, Jose Manuel De Paco Soto |
| 2435666 v.0.2 | | | LNA-R-ES-0011 v.0.2 | Under Approval | 2020-12-09 |
| Approved 17/11/2020 | not needed | mail sent | ||||||||||||||||||||||
| High Voltage Power Converters for PUMA experimental area: Correctors, Quads and Bending Elements | ||||||||||||||||||||||||||||||||||
2435666 v.0.2 | | | LNA-R-ES-0011 v.0.2 | ||||||||||||||||||||||||||||||||
| Approved 17/11/2020 | ||||||||||||||||||||||||||||||||||
| AD-Target-Area Recommissioning 2021 | Tim GILES |
|
|
| 2455180 v.0.12 | | | AD-T-ES-0001 v.0.12 | Under Approval | 2021-03-08 | presented for info 09-03-21 | not needed | mail sent 07/01/2022 | |||||||||||||||||||||
| AD-Target-Area Recommissioning 2021 | ||||||||||||||||||||||||||||||||||
|
| 2455180 v.0.12 | | | AD-T-ES-0001 v.0.12 | ||||||||||||||||||||||||||||||
| 2455180 v.0.12 | | | AD-T-ES-0001 v.0.12 | |||||||||||||||||||||||||||||||
2455180 v.0.12 | | | AD-T-ES-0001 v.0.12 | ||||||||||||||||||||||||||||||||
| Manufacturing of New Operational AD Targets in 2021 | Tim GILES |
|
|
| 2570047 v.0.1 | | | AD-TARAD-ER-0003 v.0.1 | Eng Check | 2021-04-30 | to be presented for info (when is under approval) | not needed | |||||||||||||||||||||||
|
| 2570047 v.0.1 | | | AD-TARAD-ER-0003 v.0.1 | ||||||||||||||||||||||||||||||
| 2570047 v.0.1 | | | AD-TARAD-ER-0003 v.0.1 | |||||||||||||||||||||||||||||||
2570047 v.0.1 | | | AD-TARAD-ER-0003 v.0.1 | ||||||||||||||||||||||||||||||||
| Displacement of ASACUSA Escape Ladder | Maud Wehrle |
| 2702462 v.0.1 | | | AD-LJ-EC-0020 v.0.1 | Eng Check1 | 2022-02-17 | to be presented for approved (22-02) | not needed | ||||||||||||||||||||||||
Displacement of ASACUSA Escape Ladder | ||||||||||||||||||||||||||||||||||
2702462 v.0.1 | | | AD-LJ-EC-0020 v.0.1 | ||||||||||||||||||||||||||||||||
| EAST AREA | ||||||||||||||||||||||||||||||||||
| CLOUD Facility Modifications during the PS East Area (B.157) Renovation | Antti Onnela, Robert Kristic | 2301916 – PSZ-LJ-EC-0002 v.0.2 | In work | 2020/09/30 | to be presented for approval when ready | not needed | mail sent to author 7/01/2022 | |||||||||||||||||||||||||||
| Low-energy Beams in the T09 Beamline of the New CERN East Area | Johannes Bernhard, Giulia Romagnoli | 2370892 – PSZ-LJ-EC-0001 v.0.5 | Under approval #3 | 2022/01/07 | approved 2020/09/01 to be presented for approval | not needed | ||||||||||||||||||||||||||||
| Search and Secure Procedure for the PS East Area Secondary Areas T09-10, T09 and T10 | Johannes Bernhard | 1204548 – PSZ-S-PRD-0002 v.4.1 | eng check #1 | 2021/09/22 | to be presented for information | not needed | TBD with Johannes | |||||||||||||||||||||||||||
| Safety Permits for the East Area | Filipa Carvalho | 2611644 – PSZ-S-SR-0015 v.0.2 | Engineering check #2 | 2021/10/18 | presented for information 2020/12/14 | not needed | |||||||||||||||||||||||||||
Safety Permits for the East Area | ||||||||||||||||||||||||||||||||||
| ODH Risk assessment B.817 | Filipa Carvalho |
| 2423229 v.0.1 | | | PSZ-S-SR-0001 v.0.1 | Engineering Check #1 | 2021-11-30 | presented for information 2020/12/14 | not needed | ||||||||||||||||||||||||
ODH Risk assessment B.817 | ||||||||||||||||||||||||||||||||||
2423229 v.0.1 | | | PSZ-S-SR-0001 v.0.1 | ||||||||||||||||||||||||||||||||
| Installation of Additional Beam Loss Monitors in the East Area Primary Lines | Oliver Hans | 2689447 PSZ-B-EC-0004 v.0.1 | Engineering Check #1 | 2022-02-04 | to be presented for info | not needed | ||||||||||||||||||||||||||||
| NORTH AREA | ||||||||||||||||||||||||||||||||||
| The ECR concerns the modification of the K12 beam line in NA62 | Hans Danielsson | 2255637 | In work | 2020/01/06 | to be presented for approval | ? | TBD with Johannes | |||||||||||||||||||||||||||
| Functional Positioning Scheme for the SPS North Area | Giulia Romagnoli | 2232190 – SPSX-L-ES-0001 v-0.5 | Under Approval #3 | 2022/01/13 | to be presented for approval | to be presented for approval | ||||||||||||||||||||||||||||
| Expert Name for Equipment North Area Beamlines | Giulia Romagnoli |
| 2681333 v.0.1 | | | SPSX-L-ES-0002 v.0.1 | In work | 2022/01/13 | to be presented for information | not needed | first version to be written | ||||||||||||||||||||||||
2681333 v.0.1 | | | SPSX-L-ES-0002 v.0.1 | ||||||||||||||||||||||||||||||||
| North Area Technical Galleries Locking, Padlocks and Patrol Procedure | Johannes Bernhard |
| 2391345 v.0.2 | | | SPSX-S-OP-0001 v.0.2 | under approval | 2020-06-29 | to be presented for approval | not needed | |||||||||||||||||||||||||
2391345 v.0.2 | | | SPSX-S-OP-0001 v.0.2 | ||||||||||||||||||||||||||||||||
| Impact of VXSS vacuum failure for operation of the M2 beam line and the attached experiments | Johannes Bernhard |
|
|
| 2694747 v.0.1 | | | SPSX-V-MEMO-0001 v.0.1 | Engineering check #1 | 2022-02-11 | not needed | not needed | |||||||||||||||||||||||
|
| 2694747 v.0.1 | | | SPSX-V-MEMO-0001 v.0.1 | ||||||||||||||||||||||||||||||
| 2694747 v.0.1 | | | SPSX-V-MEMO-0001 v.0.1 | |||||||||||||||||||||||||||||||
2694747 v.0.1 | | | SPSX-V-MEMO-0001 v.0.1 | ||||||||||||||||||||||||||||||||
| ASSET REPLACEMENT REQUEST – QWL.X0610072 | Philip Schwarz |
| 2707044 v.0.1 | | | SPSX-M-EC-0001 v.0.1 | under approval #1 | 2022/02/24 | to be presented for information (15 of march) | not needed | ||||||||||||||||||||||||
ASSET REPLACEMENT REQUEST – QWL.X0610072 | ||||||||||||||||||||||||||||||||||
2707044 v.0.1 | | | SPSX-M-EC-0001 v.0.1 | ||||||||||||||||||||||||||||||||
| NORTH AREA CONSOLIDATION | ||||||||||||||||||||||||||||||||||
| Technical Gallery GT80: General Description | Alexios Tryfonas CHARALAMBOUS | 2568243 – SPSX-J-ER-0001 v.0.2 | Under Approval #1 | 2022/01/27 | presented for information 2020/12/14 | not needed | ||||||||||||||||||||||||||||
| Lock-out Procedure for EHN1 Decabling during YETS 2021-2022 | Michael Jeckel | 2548835 SPSX-ED-OP-0001 v.0.3 | Engineering Check #2 | 2021/12/06 | presented for future apporval To be presented for approval | not needed | ||||||||||||||||||||||||||||
| MANDATE OF THE NORTH AREA DECABLING WORKING GROUP | Michael Jeckel | 2611997 SPSX-LJ-WD-0002 v.0.4 | Under approval #1 | 2021/12/21 | to be presented for approval (for first 2021) | not needed | ||||||||||||||||||||||||||||
| De-cabling Campaign EHN1 YETS 2021/22 | Alexios Tryfonas Charalambous; Michael Jeckel |
| 2665489 v.0.3 | | | SPSX-E-EC-0002 v.0.2 | Under Approval #1 | 2022/01/12 | to be presented for future approval (next EATM) | not needed | |||||||||||||||||||||||||
2665489 v.0.3 | | | SPSX-E-EC-0002 v.0.2 | ||||||||||||||||||||||||||||||||
| North Area Consolidation Decabling Work Plan | Michael JECKEL |
| 2640125 v.0.2 | | | SPSX-ED-OP-0002 v.0.2 | Engineering check #1 | 2021/12/21 | to be presented for information | not needed | |||||||||||||||||||||||||
2640125 v.0.2 | | | SPSX-ED-OP-0002 v.0.2 | ||||||||||||||||||||||||||||||||
| MANDATE OF THE INFRASTRUCTURE & SERVICES COORDINATOR OF THE NA-CONS PROJECT | Mats Wilhelmsson |
| 2458861 v.0.3 | | | SPSX-PM-MG-0006 v.0.3 | Engineering check #1 | 2022-02-11 | for info | not needed | |||||||||||||||||||||||||
2458861 v.0.3 | | | SPSX-PM-MG-0006 v.0.3 | ||||||||||||||||||||||||||||||||
| OTHER AREAS | ||||||||||||||||||||||||||||||||||
| OVERALL | ||||||||||||||||||||||||||||||||||
| Guideline for Identifiers of Beamline Equipment in the Experimental Areas | Giulia Romagnoli |
| 2355703 | under approval 2 | 2022-01-28 | to be presented for information | not needed | new version to be prepared | ||||||||||||||||||||||||||
| 2355703 | ||||||||||||||||||||||||||||||||||
| Proposal of a Circuit Coordinator for Experimental Areas | Ramon Folch |
| 2478208 | RELEASED | 2022-02-17 | to be presented for information | not needed | |||||||||||||||||||||||||||
| 2478208 | ||||||||||||||||||||||||||||||||||
| EQUIPMENT | ||||||||||||||||||||||||||||||||||
| Production of a new CEDAR-H detector and its required infrastructure for NA-62 | Antonio Lafuente Mazuecos | 2621859 – v0.1 | Engineering Check #1 | 2021/09/20 | to be presented for approval | not needed | ||||||||||||||||||||||||||||
BE-EA Equipment Responsibility | Giulia Romagnoli | 2442877 | Under Approval 1 | 2022/02/24 | to be presented for information when ready | not needed | ||||||||||||||||||||||||||||
| Engineering Specification XCET East Area | Giulia Romagnoli | 2255312 PSZ-X-ES-0001 v.0.4 | Under approval #3 | 2021/12/10 | to be presented for approval | not needed | TBD Johannes | |||||||||||||||||||||||||||
| XTAX Engineering Specification | Yannis Fiammingo, Antonio Lafuente Mazuecos |
| 2593676 v.0.2 | | | SPSX-T-ES-0001 v.0.2 | Engineering Check #1 | 2021/12/21 | not needed | not needed | to be moved | |||||||||||||||||||||||
XTAX Engineering Specification | ||||||||||||||||||||||||||||||||||
2593676 v.0.2 | | | SPSX-T-ES-0001 v.0.2 | ||||||||||||||||||||||||||||||||
| LHC experiments | ||||||||||||||||||||||||||||||||||
| MoEDAL MAPP mQP detector in UA83 | Francois Butin | 2617044 – v0.1 | Engineering Check #1 | 2021/08/23 | passed on to EN-ACE (Sept 2021) | – | ||||||||||||||||||||||||||||
| A Shielding Wall in UX85 for LHC Run 5 | Francois Butin | 2424228 – v0.1 | Under approval #1 | 2021/08/16 | passed on to EN-ACE (Sept 2021) | |||||||||||||||||||||||||||||
ECRs/important EDMS documents that have been approved:
| Document Title | Author | EDMS ref | Status | Last EDMS Update | EATM | IEFC | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document # | documents are presented for approval earliest at the second version (under approval) or when there are no further blocking comments on it. | |||||||||||||||
| AD – ELENA | ||||||||||||||||
| New valve for ELENA to Aegis transfer line LNE02 | Francois Butin | 2144666 – LNA-LJ-EC-0002 v.0.2 | RELEASED | 2019/06/21 | approved 2021/06/01 | approved 2021/06/09 | ||||||||||
| A Second Laser Room for GBAR | Francois Butin | 2170108 – AD-LJ-EC-0013 v.1.0 | RELEASED | 2019/07/29 | Approved | Presented | ||||||||||
| An Experimental Area at AD for BASE-STEP | Francois Butin | 2464750 – AD-LJ-EC-0019 v.1.0 | RELEASED | 2021/06/29 | approved 2021/06/01 | approved 2021/06/09 | ||||||||||
| Mechanical Consolidation of the DI.BTV6008 in the AD Target Area | Stephane Burger | 2506189 – AD-BTV-EC-0001 v.1.0 | RELEASED | 2021/08/18 | approved 2021/06/22 | – | ||||||||||
| An additional beam line at ELENA: LNE51 | Matthew Alexander Fraser | 2397210 – AD-L-ES-0001 v.1.0 | RELEASED | 2021/09/01 | approved 2021/06/22 | approved 2021/09/01 | ||||||||||
| New Experimental Area for PUMA | Francois Butin | 2151516 – AD-LJ-EC-0011 v.1.0 | RELEASED | 2021/09/02 | approved 2021/01/26 & 2021/08/24 | approved on 2021/09/01 | ||||||||||
| ASSET REPLACEMENT REQUEST – LNE.ZQNA.5050 | Antoine Prost |
| 2666124 v.1.0 | | | LNA-ZQNA-EC-0001 v.1.0 | RELEASED | 2022/01/13 | presented for Information 136th EATM | sent in info mail 3rd week january | |||||||
2666124 v.1.0 | | | LNA-ZQNA-EC-0001 v.1.0 | ||||||||||||||
| Installation of Capacitor Discharge MarXDisCap Power Converters for AD Consolidation | Davide Aguglia | 1845156 – AD-R-EC-0002 v.1.0 | RELEASED | 2022/01/14 | – | approved by IEFC | ||||||||||
| EAST AREA | ||||||||||||||||
| Installation of a Mobile Shutter in the T11 beamline of the New CERN East Area | Antonio Alonso | 2472730 – PSZ-S-EC-0002 v.1.0 | RELEASED | 2021/08/18 | presented 2021/06/01 & represented 2021/08/03 (after clarifying meeting w/ CLOUD) | – | ||||||||||
| New Beam Instrumentation for IRRAD and CHARM on T08 Line | Federico Ravotti | 2379119 – PSZ-B-EC-0002 v.1.0 | RELEASED | 2021/08/18 | presented & approved 2021/08/03 | – | ||||||||||
| A WIC Magnet Interlock System for the East Area | Adrian Miranda Fontan, Richard Mompo | 2037701 – | RELEASED | 2021/10/27 | presented for Information 2021/10/05 | – | ||||||||||
| Installation of a New Beam Loss Monitoring System in the East Area Lines | Giulia Romagnoli | 2304791 – PSZ-B-EC-0001 v.1.0 | RELEASED | 2021/11/12 | presented & approved 2021/10/26 | – | ||||||||||
| Installation of the Water Cerenkov Test Experiment in the T09 beamline | Dipanwita Banerjee | 2618347 – PSZ-J-EC-0001 v.1.1 | RELEASED | 2022/02/10 | presented & approved 2021/11/16 | Approved 2021/11/19 | ||||||||||
| NORTH AREA | ||||||||||||||||
Transforming PPE144 (EHN1) into a User Zone | Nikolaos Charitonidis | 1865057 – SPSX-L-EC-0004 v.3.1 | RELEASED | 2021/06/07 | Approved 2021/01/26 | Approved 2021/05/07 | ||||||||||
| Changes to the M2 Beamline for the 2021 Test Runs | Johannes Bernhard, Dipanwita Banerjee | 2338657 – SPSX-L-EC-0003 v.1.0 | RELEASED | 2021/08/18 | Approved 2021/08/03 | Approved 2021/08/13 | ||||||||||
| Electrical circuits layout between converters and magnets | Philip Schwarz | 1062808 | RELEASED | 2021/10/14 | presented for Information 2021/10/26 | – | ||||||||||
| IT Network Cables Rerouting in EHN1 | Alexios Tryfonas CHARALAMBOUS |
| 2652133 v.1.0 | | | SPSX-E-EC-0001 v.1.0 | RELEASED | 2022/01/12 | approved at 136th EATM meeting | – | |||||||
2652133 v.1.0 | | | SPSX-E-EC-0001 v.1.0 | ||||||||||||||
| Memorandum – Scope North Area Safety File | Filipa Carvalho | 2646777 SPSX-S-MEMO-0001 v.1.0 | RELEASED | 2022/01/14 | presented at 136th EATM meeting | – | ||||||||||
| OTHER AREAS | ||||||||||||||||
| TT66 HiRadMat Be Window Relocation | Chiara Pasquino | RELEASED | 2021/11/15 | approved at 134th EATM meeting | approved at 295th IEFC | |||||||||||
| Relocation of the TT66 Fast Beam Current Transformer BCTFI.660516 | Tom Levens | 2647541 HRM-B-EC-0001 v.1.0 | RELEASED | 2022/01/11 | approved at 136th EATM meeting | approved by EDMS in january 2022 | ||||||||||
| OVERALL | ||||||||||||||||
| EQUIPMENT | ||||||||||||||||