Documents For Experts
All document in BLUE are already ported in the NEW JIRA PROJECT
| Document Title | Author | Status | EDMS creation | Last EDMS Update | EATM | IEFC | COMMENTS | |||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document # | Document Title | documents are presented for approval earliest at the second version (under approval) or when there are no further blocking comments on it. | ||||||||||||||||||||||||||||||||||||||||||||
| AD – ELENA | ||||||||||||||||||||||||||||||||||||||||||||||
| Manufacturing of New Operational AD Targets in 2021 | Claudio Torregrosa, Tim GILES | 2570047 | AD-TARAD-ER-0003 v.0.1 | Engineering Check #1 | 2021/04/26 | 2021/04/30 | presented for information 2021/06/01 | – | mail sent 17/01 | |||||||||||||||||||||||||||||||||||||
| AD Experimental Areas Personnel Protection System: Zones and Important Safety Elements | Boris Morand | 1520757 | LNA-Y-ES-0002 v.1.2 | RELEASED | 2015/06/24 | 2021/09/06 | v1.2 update presented for info 2021/09/14 | – | ||||||||||||||||||||||||||||||||||||||
| AD SCRAPER DESIGN REPORT | Aurelio de Macedo |
| 1976141 | AD-TS-ER-0001 v.0.2 |
| Under Approval | 2018-05-23 | 2019-09-25 | not needed | not needed | mail sent to Edouard 12/01/2022 | ||||||||||||||||||||||||||||||||||
| AD SCRAPER DESIGN REPORT | ||||||||||||||||||||||||||||||||||||||||||||||
| 1976141 | ||||||||||||||||||||||||||||||||||||||||||||||
Under Approval | ||||||||||||||||||||||||||||||||||||||||||||||
| Patrol Procedure for Experimental Area ELENA | Tommy Eriksson, Pierre Freyermuth |
| 1723471 |
| LNA-S-PRD-0001 v.1.2 |
| Under Approval | 2016-10-03 | 2020-07-08 | ?? | mail sent Laurette Ponce 07/01/2022 | ||||||||||||||||||||||||||||||||||
| Patrol Procedure for Experimental Area ELENA | ||||||||||||||||||||||||||||||||||||||||||||||
| 1723471 | ||||||||||||||||||||||||||||||||||||||||||||||
LNA-S-PRD-0001 v.1.2 | ||||||||||||||||||||||||||||||||||||||||||||||
Under Approval | ||||||||||||||||||||||||||||||||||||||||||||||
| Layout of ELENA Transfer Lines | Wolfgang Bartmann |
| 1388169 | LNA-LJ-ES-0001 v.2.1 | Under Approval | 2014-06-02 | 2020-09-30 | presented for info | not needed | mail sent Wolfang 07/01/2022 | ||||||||||||||||||||||||||||||||||||
| 1388169 | ||||||||||||||||||||||||||||||||||||||||||||||
| RISK ASSESSMENT FOR THE INDIVIDUAL SYSTEM TESTS OF AD INJECTION KICKERS DURING YETS21-22 | Vasco NAMORA |
|
|
| 2683367 v.0.1 | | | AD-MK-SR-0001 v.0.1 | Eng Check 1 | 2022/01/21 | 2022/01/21 | not needed | not needed | ||||||||||||||||||||||||||||||||||
|
| 2683367 v.0.1 | | | |||||||||||||||||||||||||||||||||||||||||||
| 2683367 v.0.1 | | | ||||||||||||||||||||||||||||||||||||||||||||
2683367 v.0.1 | | | |||||||||||||||||||||||||||||||||||||||||||||
| PUMA Electric Generator – Metallic Support | Maud Wehrle | 2684320 |
| AD-K-RPT-0001 v.0.1 | Eng Check 1 | 2022/01/22 | 2022/01/26 | not needed | not needed | |||||||||||||||||||||||||||||||||||||
AD-K-RPT-0001 v.0.1 | ||||||||||||||||||||||||||||||||||||||||||||||
| EAST AREA | ||||||||||||||||||||||||||||||||||||||||||||||
| OPERATIONAL READINESS ANALYSIS FOR THE 2021 RESTART OF THE EAST AREA | Alexander Gerbergshagen | 2499213 | PSZ-O-OR-0001 v.0.2 | Released | 2021/03/05 | 2021/07/06 | presented for info 2021/06/22 | – | ||||||||||||||||||||||||||||||||||||||
| Realization of Airtightness of the Primary Area, T8a and T8b part of the EAR Project | Oliver Boettcher |
| 2453913 v.0.3 | PSZ-S-ES-0004 v.0.3 |
| Engineering Check | 2020-12-09 | 2021-02-16 | to be presented for info | – | ||||||||||||||||||||||||||||||||||||
2453913 v.0.3 | ||||||||||||||||||||||||||||||||||||||||||||||
Engineering Check | ||||||||||||||||||||||||||||||||||||||||||||||
| Hazard identification & risk assessment for the experimental areas of the East Hall | Boris Morand Filipa CARVALHO Louis-Fred ANDRE | PSZ-S-ES-0003 v.1.0 PSZ-Y-ES-0003 v.1.0 | Released | 2020/10/09 | 2021/06/28 | presented for info 2021/06/22 | – | |||||||||||||||||||||||||||||||||||||||
| Risk Assessment for the Individual System Tests of Cooling and Ventilation in East Area | Francesco Dragoni | 2426483 | PSZ-S-SR-0003 v.0.1 | Engineering Check #1 | 2020-10-09 | 2020-10-1 | presented for info 2021/01/26 | – | email to author 19/01/2022 for new version | |||||||||||||||||||||||||||||||||||||
| Risk Assessment for the Individual System Tests of the Alarm Network in East Area | Denis Raffourt Melania Averna Filipa Carvalho | 2452963 | PSZ-S-SR-0009 v.0.1 | RELEASED | 2020/12/08 | 2021-07-06 | to be presented for Info | – | ever presented? released by Filipa | |||||||||||||||||||||||||||||||||||||
| Risk Assessment for the Individual System Tests of the Beam Intercepting Devices in East Area | Edouard Grenier Boley Aboubakr Ebn Rahmoun Filipa Carvalho | 2452951 | PSZ-S-SR-0008 v.0.3 | RELEASED | 2020/12/08 | 2021-06-29 | to be presented for Info | – | ever presented? released by Filipa | |||||||||||||||||||||||||||||||||||||
| Risk Assessment for the Individual System Tests of the RP Monitor in East Area | Arnaud Devienne Robert Froeschl Guillaume Michet Jérémy Rosset-Lanchet Filipa Carvalho | 2452968 | PSZ-S-SR-0011 v.0.2 | RELEASED | 2020/12/08 | 2021-07-06 | to be presented for Info | – | ever presented? released by Filipa | |||||||||||||||||||||||||||||||||||||
| Procedure and Risk Assessment for the Individual System Tests of the Personnel Protection System in the East Area | Eva Sanchez-Corral Boris Morand Didier Chapuis Filipa Carvalho | 2426479 | PSZ-S-SR-0002 v.1.1 | RELEASED | 2020/10/09 | 2021/06/29 | presented for info 2021/08/03 | – | ||||||||||||||||||||||||||||||||||||||
| East Hall Experimental Areas Personnel Protection System: Zones and Important Safety Elements | Boris Morand | 2457500 | PSZ-S-ES-0005 v.0.3 | Under Approval #2 | 2020/12/15 | 2022/01/20 | presented for info 2021/09/14 | – | FIX PSZ-S-ES-0006(!) | |||||||||||||||||||||||||||||||||||||
| Risk Assessment for the Individual System Tests of Cherenkov Counters in East Area | Filipa Carvalho Giulia Romagnoli | 2398014 | PSZ-S-SR-0006 v.1.0 | RELEASED | 2020/10/09 | 2022/01/19 | presented for Info | – | ||||||||||||||||||||||||||||||||||||||
| Etude sur les Besoins en AUGs dans la Galerie Technique du B.817 | Louis-Frederic Andre | 2423227 | PSZ-S-SSR-0002 v.0.2 | Under Approval #2 | 2021/03/01 | 2021/08/26 | presented for info 2021/09/14 | – | ||||||||||||||||||||||||||||||||||||||
| Safety Analysis of the Cherenkov Counters (XCET) in the Framework of the East Area | Louis-Frederic Andre | 2395550 | PSZ-S-SSR-0001 v.1.0 | RELEASED | 2020/07/09 | 2021/03/04 | presented for info 2021/01/26 | – | ||||||||||||||||||||||||||||||||||||||
| Roof Opening Procedure of the Primary Area in the East Area | Michael Lazzaroni | 2634294 | PSZ-O-PRD-0002 v.0.1 | in work | 2021/09/23 | 2021/09/23 | to be presented for approval | not needed | document created for author (filipa/michael) first version not ready for circulation waiting for author | |||||||||||||||||||||||||||||||||||||
| Visual Inspection XCET Optical Windows | Giulia Romagnoli, Aboubakr Ebn Rahmoun | 2457765 | PSZ-X-RPT-0001 v.1.0 | RELEASED | 2021/09/23 | 2022/01/13 | not needed | – | ||||||||||||||||||||||||||||||||||||||
East_Area_Safety_File-Descriptive_part | LF. ANDRE, previous safety file editors and contributors | 1273737 | PSZ-L-SF-0001 v.0.7 | Under Approval | 2021/09/28 | not needed | – | |||||||||||||||||||||||||||||||||||||||
| East_Area_Safety_File-Demonstrative_part | F. Carvalho & L-F. André and previous safety file editors and contributors | 1273738 | PSZ-L-SF-0002 v.0.5 | Under Approval | 2021/09/28 | not needed | – | |||||||||||||||||||||||||||||||||||||||
| East_Area_Safety_file-Operational_part | F. Carvalho & L-F. André and previous safety file editors and contributors | 1273739 | PSZ-L-SF-0003 v.0.5 | Under Approval | 2021/09/28 | not needed | – | |||||||||||||||||||||||||||||||||||||||
| ODH & CO2 Risk Analysis for the East Area | Louis-Frederic Andre | 2414259 | PSZ-S-ER-0003 v.0.3 | Under Approval #1 | 2020-09-01 | 2021/10/28 | to be presented for Info | – | status? | |||||||||||||||||||||||||||||||||||||
| Evacuation distances in Primary, mixed and experimental area in the East Area (B.157) after the renovation | ERWAN HARROUCH ; LOUIS-FREDERIC ANDRE | 1892798 | PSZ-S-ES-0001 v.1.1 | RELEASED | 2018-01-17 | 2021/10/28 | to be presented for Info | |||||||||||||||||||||||||||||||||||||||
| Etude sur les besoins en ventilation des salles de contrôles du B.157 | Louis-Frederic Andre | 2493783 |
| PSZ-U-SSR-0001 v.0.4 | Engineering check 2 | 2021-03-01 | 2022-01-19 | to be presented for Info | – | ||||||||||||||||||||||||||||||||||||
Etude sur les besoins en ventilation des salles de contrôles du B.157 | ||||||||||||||||||||||||||||||||||||||||||||||
PSZ-U-SSR-0001 v.0.4 | ||||||||||||||||||||||||||||||||||||||||||||||
| Rack Organization East Area | Aboubakr Ebn Rahmoun |
|
|
|
| 2314008 v.0.3 | | | PSZ-E-SCH-0001 v.0.3 | Under Approval | 2020-01-23 | 2022-01-12 | to be presented for Info | – | |||||||||||||||||||||||||||||||||
|
|
| 2314008 v.0.3 | | | ||||||||||||||||||||||||||||||||||||||||||
|
| 2314008 v.0.3 | | | |||||||||||||||||||||||||||||||||||||||||||
| 2314008 v.0.3 | | | ||||||||||||||||||||||||||||||||||||||||||||
2314008 v.0.3 | | | |||||||||||||||||||||||||||||||||||||||||||||
| NORTH AREA | ||||||||||||||||||||||||||||||||||||||||||||||
| OPERATIONAL READINESS ANALYSIS FOR THE 2021 RESTART OF THE NORTH AREA | Alexander Gerbershagen | 2593302 | NA-ORA-2021 v.0.1 | RELEASED | 2021/06/07 | 2021/07/09 | presented for info 2021/06/22 | – | ||||||||||||||||||||||||||||||||||||||
| NORTH AREA CONSOLIDATION | ||||||||||||||||||||||||||||||||||||||||||||||
| Energy extraction systems for ATLAS/Morpurgo, VERTEX 1 and VERTEX 2 | Bozhidar Panev, Mirko Pojer | 2513598 | SPSX-ED-WD-0001 v.1 | Engineering Check #1 | 2021/03/25 | 2021/08/22 | to be presented for Info | – | status? | |||||||||||||||||||||||||||||||||||||
| Beam Line Configuration and Operational Impact of NACONS Activities | Nikolaos Charitonidis |
| 2667383 v.0.2 | | | SPSX-L-WD-0001 v.0.2 | Engineering Check #1 | 2021-11-30 | 2021-11-30 | not needed | not needed | ||||||||||||||||||||||||||||||||||||
2667383 v.0.2 | | | |||||||||||||||||||||||||||||||||||||||||||||
| Integration of the North Experimental Area | Kevin Buffet | 2488117 |
| SPSX-LJ-WD-0001 v.0.5 | Engineering Check #1 | 2021-02-20 | 2022-01-26 | not needed | not needed | ||||||||||||||||||||||||||||||||||||
Integration of the North Experimental Area | ||||||||||||||||||||||||||||||||||||||||||||||
SPSX-LJ-WD-0001 v.0.5 | ||||||||||||||||||||||||||||||||||||||||||||||
| Gas distribution North Area (User requirement) | DAVID JAILLET |
|
|
| 2042270 v.2.2 | | | SPSX-F-ES-0001 v.2.2 |
| Under Approval |
| 2018-10-25 | 2021-02-22 |
| presented for info 09-03-21 | not needed | |||||||||||||||||||||||||||||||
|
| 2042270 v.2.2 | | | |||||||||||||||||||||||||||||||||||||||||||
| 2042270 v.2.2 | | | ||||||||||||||||||||||||||||||||||||||||||||
2042270 v.2.2 | | | |||||||||||||||||||||||||||||||||||||||||||||
Under Approval | ||||||||||||||||||||||||||||||||||||||||||||||
2018-10-25 | ||||||||||||||||||||||||||||||||||||||||||||||
| presented for info 09-03-21 | ||||||||||||||||||||||||||||||||||||||||||||||
| OTHER AREAS | ||||||||||||||||||||||||||||||||||||||||||||||
| Update of HiRadMat Beam Parameters | Francesco Maria Velotti |
| 2418077 |
| under approval | 2020-09-14 | 2021-01-11 | presented for info | – | |||||||||||||||||||||||||||||||||||||
| 2418077 | ||||||||||||||||||||||||||||||||||||||||||||||
| under approval | ||||||||||||||||||||||||||||||||||||||||||||||
| Mechanical Cable Holder – Calculations | Iasonas Chatzigeorgiou | 2686911 | – | eng check | 2022-02-01 | 2022-02-01 | – | – | |||||||||||||||||||||||||||||||||||||
Mechanical Cable Holder – Calculations | ||||||||||||||||||||||||||||||||||||||||||||||
| OVERALL | ||||||||||||||||||||||||||||||||||||||||||||||
| Radiation Shielding Management | Sebastien EVRARD, Michael LAZZARONI |
| 1307609 | Eng check | 2020-06-25 | 2020-06-29 | resented for info | not needed | mail sent to authors 12/01/2021 | ||||||||||||||||||||||||||||||||||||
| Radiation Shielding Management | ||||||||||||||||||||||||||||||||||||||||||||||
| 1307609 | ||||||||||||||||||||||||||||||||||||||||||||||
| Naming Convention for Beam Instrumentation in the Experimental Areas | Giulia Romagnoli, |
| 2364719 | in work | 2020-04-14 | 2020-04-14 | not needed | – | ||||||||||||||||||||||||||||||||||||||
| 2364719 | ||||||||||||||||||||||||||||||||||||||||||||||
| EQUIPMENT | ||||||||||||||||||||||||||||||||||||||||||||||
| User Requirements for XCET Detectors after LS2 | Giulia Romagnoli, Michael Lazzaroni | 2114239 | RELEASED | 2020-09-07 | 2020-09-07 | – | – | NEW VERSION NEEDED Functional positions WRONG!!!! | ||||||||||||||||||||||||||||||||||||||
| Electro-valves controls board for Cerenkov detectors in the Experimental Areas | Jocelyn Tan |
| 2170447 | under approval | 2019-06-14 | 2019-09-16 | not needed | nt needed | mail sent 09/12/2021 | |||||||||||||||||||||||||||||||||||||
| 2170447 | ||||||||||||||||||||||||||||||||||||||||||||||
| Engineering FEM Analysis for the Mylar Windows of the XCET detectors of the Experiemental Areas | Jan Buesa Orgaz |
| 2452647 | under approval |
| 2020-12-07 | 2022-01-12 | not needed | – | |||||||||||||||||||||||||||||||||||||
| 2452647 | ||||||||||||||||||||||||||||||||||||||||||||||
2020-12-07 | ||||||||||||||||||||||||||||||||||||||||||||||
| LHC experiments | ||||||||||||||||||||||||||||||||||||||||||||||
| SXSN1 Integration Model 22-04-21 | Antonio Lafuente Mazuecos | 2580773 | v 0.1 | Engineering check#1 | 2021/05/12 | 2021/05/18 | – | – | ||||||||||||||||||||||||||||||||||||||